Chongqing Guangbei District 57KW Distributed Solar Project

Tiempo de liberación:2020-04-02
Cantidad de clics: 1002

The project adopts 222 pieces 260 polysilicon solar modules, 2 sets of INVT BG30KTR inverter. Project adopts the stent tiling model, the total installed capacity is 57.72KWp, 380v low voltage grid-connection. The annual power generation is expected to be 45,800 degrees.


The project adopts the cooperation mode of contract energy management, building owners provide roof for free and solar power generation is sold to buildings owners at current electricity prices by 80% discount.


energy saving benefits table of 57KW distributed solar project investment in Jiangbei District Chongqing Province

NO.ProgramValue
1Total Project Investment490.3 thousand
2IRR ( total investment ) rate of return2.94%
3First year power generation44.7 thousand
4Static investment payback period (after tax)14.61 years
5Total investment rate of return2.68%
6Comprehensive price (tax included) 1 - 20 years1.06 yuan/KWh
Comprehensive price (tax included) 20-25 years0.64 yuan/KWh
7annual savings of standard coal16.50 tons
8annual reduced SO2 emissions1.23 tons
9annual reduced CO2 emissions40.72 tons


4.8 m building parapet height is the project difficulty, we need to build 4.3m and 0.3m cement foundation to ensure that the solar module is not covered by the parapet.


The project achieves grid-connection in January 2017 and is in normal operation at present.

parapet project site photo


Distributed solar project site photo

Productos relacionados recomendados
Peticiones sobre producto
Nombre:*
Empresa:
País:*
Dirección de correo electrónico:*
Teléfono:
Contenido:*

Nuestro sitio utiliza cookies para brindarle una mejor experiencia en el sitio. Al continuar navegando por el sitio, acepta nuestro uso de cookies de acuerdo con nuestra Política de cookies.