The countdown to the opening of the 2022 Beijing Winter Olympics has entered, and all preparations are now in place. The construction of competition venues is the top priority of the Winter Olympics. The National Ski Jumping Center in the Zhangjiakou competition area is one of the competition venues with the largest amount of engineering and the most technical difficulty in this Winter Olympics.
As a participant in the project construction, INVT invited the resident engineer to explain the product to us and lead us to the site in advance.
The "Snow Ruyi" project is an inclined elevator passage with an arc-shaped track that is more than 100 meters high and connects the bottom to the top of the platform. The vertical height of the entire elevator reaches 107 meters. An arc-shaped track with a gradient of 22.56 degrees at the gentlest point and 39.56 degrees at the steepest point. It is the first oblique elevator project with curved track in China.
In order to ensure the stable operation of the elevator in such a complex environment, the elevator adopts INVT EC300 elevator control system combined with INVT GD800 series inverter and servo drive, which provides a perfect solution for the elevator project, and finally realizes the on-site 90KW variable-angle inclined elevator perfect display and precise operation.
The successful operation of the "Snow Ruyi" project is the common result of the strong combination of "traditional culture" and "Made in China", "hundred years of history" and "modern technology" on the same stage.
INVT wishes the Beijing Winter Olympics to show off on the international stage and cheer for the Olympic athletes.